⚡ Same-Day Emergency Roof Repair Available — Call (833) 924-1023 Now
🏠RoofingFixed
(833) 924-1023 Call Now
RoofingFixed
Call (833) 924-1023

Services

Roof RepairLeak RepairShingle RepairFascia & FlashingRoof ReplacementTile & Flat RoofRoof InspectionRoof CleaningGutter CleaningMaintenance Plans
Service LocationsAbout RoofingFixedRoofing BlogContact & Dispatch
HomeServicesRoof Replacement
★ Official Service Specification

Full Roof Replacement — Tear-Off, Decking & New Installation

When your roof has aged beyond cost-effective repair, a complete replacement is the smartest investment you can make in your home's structure. RoofingFixed coordinates licensed roofing crews who execute clean full tear-offs down to bare plywood, replace any rotted decking, install layered synthetic underlayment systems, and apply premium architectural shingles with manufacturer-backed warranties. We finish with a magnetic nail sweep and full debris removal.

Call Dispatch: (833) 924-1023Speak With Dispatch

Our Standardized Execution Process

1

Measurement & itemized estimate

We measure your exact roof square footage and provide a line-item estimate with material specifications.

2

Tear-off & deck preparation

All existing shingles, underlayment, and flashings are stripped. Damaged plywood decking is replaced and re-nailed.

3

Layered system installation

Ice shield, synthetic underlayment, new flashings, starter strips, shingles, ridge vents, and cap shingles are installed in sequence.

Estimated Cost Breakdown Tiers

Every roof exhibits unique pitch and accessibility parameters. Typical project ranges are categorized below:

1,200–1,500 sq ft Home
Tear-off, decking check, synthetic underlayment, architectural shingles.
$4,500$8,500
2,000–2,500 sq ft Home
Full replacement with new ridge vent and all flashings.
$7,500$14,000
Class 4 Impact-Resistant Upgrade
Premium hail-rated shingles that may qualify for insurance discount.
$9,000$18,000

Warning Signs To Watch For:

  • Roof is 20+ years old and experiencing leaks in multiple locations
  • Widespread granule loss leaving bare patches across multiple slopes
  • Sagging or uneven roof deck visible from the ground
  • Multiple failed repair attempts over recent years

Common Root Causes:

  • Natural material aging from decades of UV exposure and thermal cycling
  • Cumulative storm damage beyond economical repair threshold
  • Original installation defects that have compounded over time

Industry Best Practices & Code Compliance

Proper execution of full roof replacement — tear-off, decking & new installation demands strict compliance with International Residential Code (IRC) Section R905 and local municipal building codes. Key requirements include:

Fastener Placement: Minimum 4 to 6 hot-dipped galvanized roofing nails per shingle tab positioned directly below the adhesive sealant strip.
Underlayment Standards: High-temperature self-adhering ice and water shield installed at least 24 inches inside the interior wall line in freeze zones.
Proper Ventilation: Balanced 1:300 or 1:150 net free ventilating area ratio between soffit intake and continuous ridge exhaust.

Frequently Asked Questions

Do I need to leave my home during the replacement?

No — most homeowners stay home during the job. The process is loud but safe. Pets should be kept inside away from the work area.

How long does the whole process take from estimate to completion?

Most jobs are estimated within 24 hours and completed within a week of approval, depending on weather and material availability.

Connect For Roof Replacement

Speak directly with central dispatch to schedule a local contractor.

Live Dispatchers Available Now

Speak With A Roofing Specialist

Skip waiting for online forms. Call our central dispatch desk directly to check real-time contractor availability in your local area.

(833) 924-1023
⚡ Tap To Call & Dispatch Local Roofer
Average Wait: Under 30 Seconds
Direct Routing to Verified Local Crews
Emergency Leaks & Storm Patching Priority
On-Site Assessments & Upfront Pricing
Operating 7 Days A Week • Nationwide Dispatch Desk